Nazareth House

Client:         National Buildplan Group

Completed:  2005

Location:     Tamworth

 

This was a new build nursing home. This building includes facilities for 90 residents and the Sisters of Nazareth House. There are also kitchen, dining, laundry and other services housed within the building. We completed the hydraulics on this building including the thermostatic mixing valves, fire hydrants and hose reels, commercial hot water system and plant room, water reticulation throughout the building.

Manilla MPS

Client:         HansenYuncken

Completed:  2011

Location:     Manilla, NSW

 

This was a 2 stage complete build of a new hospital in Manilla NSW. We had the contract to complete the plumbing to this building including the rainwater harvesting system, solar hot water system, thermostatic mixing valves, back flow prevention devices, sewer pump station, water reticulation, sewer.

Walcha Hospital

Client:         ADCO Constructions

Completed:  2006

Location:     Tamworth

 

This was a new build of the Walch Hospital. We had the contract to complete the hydraulic works, this included the thermostatic mixing valves, water reticulation, sewer, back flow prevention devices, fire hydrant system including hose reels.

BUPA Amity Nursing Home

Client:         HansenYuncken

Completed:  2009

Location:     Tamworth

 

This was an extension to the existing nursing home. The build happened around the needs of the existing residents. We had the contract to complete the hydraulics to this project including the warm water system, water reticulation, fire hydrant system including hose reels, stormwater, sewer.

Tamworth Cancer Centre Early Works

Client:         HansenYuncken

Completed:  2012

Location:     Tamworth

 

This project was to divert all existing services that existed where the proposed new cancer clinic was to be built. We had the contract to divert and remove these services from the excavation site. This included sewer, stormwater and water. We also provided a sewer pump station.

Tamworth Hospital EWP4

Client:         Richard Crookes Constructions

Completed:  2013

Location:     Tamworth

 

This project was to complete the fit out of 2 x demountable buildings so that hospital services could be relocated so that demolition of existing buildings could occur to make room for the new hospital building. These buildings had specific end user requirements. One of the buildings is now the temporary home to the renal unit and the other is the temporary home to several other departments including the clinics. This package also included the relocation of steam lines and the provision of services to new boilers located throughout the hospital. Our package included the water reticulation, aerial drainage, gas reticulation, connection of the buildings to the existing services on site.

Freeman House, Rehabilitation Centre

Client:         National Buildplan Group

Completed:  2014

Location:     Armidale

 

This was a reburbishment of an existing heritage listed building with a new build attached to the existing building. We had the hydraulics contract to complete the sewer, reticulation of water, fire hydrant system including hose reels and booster assembly, reticulation of gas, stormwater to rainwater harvesting systems, solar hot water systems, thermostatic mixing valves.